M&E Group Ltd

Steer Kings Langley

Project Duration: 5 Weeks

Scope of Work: Full Electrical, Fire & Security Installation

 

Project Overview

M&E Group undertook a full-scale installation at Steer Kings Langley, transforming an empty warehouse into a fully equipped body shop. Over a five-week period, we delivered complete electrical and fire & security systems to meet the high standards required for Steer’s operations, ensuring compliance with premium automotive brand approvals.

 

Key Deliverables: 

Electrical Installations: 

 

  • Installed high bay lighting in the main warehouse, achieving 1000 lux to meet the approval standards of high-end car brands.
    Set up multiple 3-phase power supplies to support essential workshop equipment.
    Installed EV chargers, positioned both inside and outside for maximum accessibility.

 

  • Fire & Security Systems:
  •  
  • Installed a comprehensive fire alarm system to ensure safety compliance.
    Supplied and fitted fire extinguishers throughout the facility.
    Implemented secure door access control and door contacts for controlled entry.
    Installed a CCTV system covering key areas, both inside and outside the site.
    Integrated a 24/7 police-monitored security system for round-the-clock protection.

Outcome

M&E Group successfully delivered a fully operational, high-spec facility tailored to Steer’s needs. The project was completed on time and to the highest industry standards, ensuring the site was fully equipped, secure, and ready for high-end vehicle repairs and servicing.