Steer Snetterton

Project Duration: Large-Scale Project
Scope of Work: Full Electrical, Air Conditioning & Security Installation

Project Overview

M&E Group took on a major industrial project near Snetterton Racecourse, originally completing the full fit-out for M&A Coachworks. Following the acquisition of the workshop by Steer Automotive—one of our previous clients—we seamlessly continued to deliver high-quality electrical, air conditioning, and security solutions to meet their operational needs.

Key Deliverables:

Electrical Installations:

  • Installed 42 high bay lights in the workshop to ensure optimal visibility.
  • Fitted 36 x 600×600 LED panel lights under the mezzanine for efficient and uniform lighting.
  • Installed multiple 3-phase power supplies to support heavy-duty automotive equipment.
  • Set up 15 EV chargers, strategically placed both outside the front and within the workshop for convenience.

Air Conditioning Solutions:

  • Installed 5 indoor AC units in the offices and reception area, providing a comfortable environment for staff and customers.
  • Mounted 4 sleek outdoor units on brackets at the front of the building, keeping them neat, secure, and out of sight.

Security & Access Control:

  • Installed a high-end CCTV system with multiple cameras covering both the perimeter and interior of the building.
  • Implemented secure door access control and door contacts for restricted entry and enhanced security.
  • Integrated a 24/7 police-monitored security system for maximum protection.

Outcome

By handling the entire project from start to finish, M&E Group delivered a fully integrated, high-spec facility ready for Steer Automotive’s operations. The combination of advanced lighting, efficient climate control, and top-tier security ensures a safe, functional, and future-proof workspace for the automotive business.